Title: FY2022 First Quarter Performance Indicator Report
Sponsors: Albuquerque Bernalillo County Water Utility Author
Attachments: 1. C-22-6

t

FY2022 First Quarter Performance Indicator Report

b

 

The Quarterly Performance Report provides a snapshot of utility performance. The Scorecard Indicators are categorized by Level of Service areas. The Scorecard Indicators are developed through benchmarking and performance assessments to identify performance gaps and to establish targets to address performance gaps. The Scorecard Indicators Targets are linked to performance benchmarking, the Goals and Objectives, Customer Opinion Survey responses, and Effective Utility Management.  The purpose of this report is to provide a one-page snapshot of the utility's performance so that stakeholders can easily gauge how the utility is performing in these Level of Service areas which is consistent with the feedback received through the Customer Conversation forums on reporting preferences.

 

The report identifies the fiscal year-to-date performance compared to the established target. A status of each indicator is provided in three categories: target achieved, work- in-progress, or target not met. Below is a summary status of the 22 Scorecard Indicators. The following page shows the actual and target performance for all 22 indicators.

 

Summary Status

 

On Target / Target Achieved

Work in Progress / Below Target

Target Not Met

18 of 22

4 of 22

0 of 22

 

FISCAL IMPACT:

None

 

 

 

 

 

 

 

 

 

 

 

 

Level of Service Area

Indicator

FY22 1Q Actual (FY TO DATE)

FY22 Target

Status

Regulatory

Number of Permit Excursions

1

< 5

p

 

Reported Overflows

1

< 40

p

 

Sewer Use/Wastewater Control Ordinance Compliance

81% Permitted Industrial Users 87% Food Service Est. 99% Dental Offices

> 87% Permitted Industrial Users > 87% Food Service Est. > 87% Dental Office

¢

Reliability

Facility Planned Maintenance Ratios

64% ground water 91% surface water 47% water reclamation

> 60% ground water > 60% surface water > 45% water reclamation

p

 

Water System Inspection Effectiveness

282 miles surveyed 561 miles monitored 16 leaks found 14 MGY water loss reduced

 > 650 miles surveyed > 2,200 miles monitored > 80 leaks found >75 MGY water loss reduced

¢

 

Miles of Sewer Line Cleaned

104 miles

400 to 600 miles

p

 

Sewer Line Inspection Effectiveness  (CMOM 10 Year Target)

814 miles televised

> 795 miles televised

p

 

Injury Time

298 hours

< 2,600 hours

p

Quality

Water Quality Complaints Rate (per 1,000 customers)

1.4

< 3

p

 

% of Biosolids to Compost

28%

> 30%

¢

 

Renewable Energy

24% Bio Gas 6% Solar

> 20% Bio Gas > 5% Solar

p

 

Water Consumption

9.8 BGY GW 0 BGY SW

< 18 BGY GW > 16 BGY SW

p

Customer Service

Wait Time (minutes)

0:31 seconds

< 1 minutes

p

 

Contact Time (minutes)

4:07 minutes

< 4 minutes

¢

 

Abandoned Call Ratio

2%

< 3%

p

 

First Call Resolution

97%

> 95%

p

 

Bill Exception Rate (per 10,000 Bills)

5

< 8

p

Finance

Rehabilitation Spending

$6 million

> $64 million

p

 

Pipe Infrastructure Emergency vs. Planned Spending

82% Planned 18% Emergency

> 50% Planned  < 50% Emergency

p

 

Cash Reserves (Days)

297 days

> 350 days

p

 

Revenue to Expenditures

78%

> 100%

p

 

Expenditures to Budget

112%

< 100%

p

 