C-12-14
t
Selection Advisory Committee Recommendation of Award
Southside Water Reclamation Plant Solids Dewatering Facility Replacement - Project No. 4781.60
b
SUMMARY:
The Selection Advisory Committee met on August 3, 2012 to consider the following project:
Southside Water Reclamation Plant Solids Dewatering Facility Replacement -
Project No. 4781.60.
PROJECT DESCRIPTION:
A new solids dewatering facility (SDF) is required at the Southside Water Reclamation Plant (SWRP). The SWRP has a nominal capacity of 76 mgd and uses anaerobic digestion to stabilize the sludge. Dewatering is performed using centrifuges. The existing SDF, does not provide reliable service, requires large amounts of annual maintenance, is at the end of its useful life, and needs to be replaced with a new, modern facility. The Engineer will conduct a preliminary design, prepare a Design Analysis Report (DAR), prepare a detailed design including construction bid documents, and provide engineering services during construction. Additional work may be authorized.
FISCAL IMPACT:
Estimated construction cost is $10,000,000 to $15,000,000 per year which includes permitting, design, & construction. Funding will be provided through the Water Authority's Capital Implementation Program. The project study, design, and construction phases should be completed in a three year time frame.
PROJECT JUSTIFICATION:
The existing SDF creates workplace hazards for Water Authority employees, does not provide reliable service, requires large amounts of annual maintenance, is at the end of its useful life, and needs to be replaced with a new, modern facility. The new SDF will provide a safer facility reducing risk of personal injury to Water Authority staff. It will also provide a more reliable facility reducing the risk of National Pollutant Discharge Elimination System (NPDES) permit violations. The new SDF will also have improved odor control systems to reduce the risk of malodorous complaints from the residents living adjacent to the Southside Water Reclamation Plant.
RECOMMENDATION:
Based on the scoring of proposals the Selection Advisory Committee recommends Carollo Engineering for this project. I concur with this recommendation. In accordance with the Selection Advisory Committee Ordinance, Section 6-1-1 et seq., the following in rank order is the consultant selection recommendation concerning the procurement of professional services for the above-referenced project:
1. Carollo Engineering
2. MWH
3. AECOM
4. Smith Engineering
5. Molzen Corbin
The Committee's score sheet compilation and Minutes of the Meeting are attached. This recommendation is being forwarded for Board consideration and approval.
Approved:
______________________________
Mark S. Sanchez, Executive Director
Date: __8/17/12_________________

Minutes of the Meeting of the
Water Utility Authority Selection Advisory Committee
August 3, 2012
Southside Water Reclamation Plant Solids Dewatering Facility Replacement
Project No: 4781.60
Present:
Larry Blair
John Stomp
Dave Price
Mike Wimberly
Anthony Montoya
Staff:
Tom Ortiz, SAC Administrator & Chairman, Selection Advisory Committee
Miriam Montoya, Administrative Assistant, Selection Advisory Committee Staff Support
Lorraine Nunez, Contract Administrator
The SAC meeting was held on August 3, 2012. Five (5) proposals were received in response to the Notice of Request for Proposals.
PROJECT DESCRIPTION:
Southside Water Reclamation Plant Solids Dewatering Facility Replacement- Project No. 4781.60
A new solids dewatering facility (SDR) is required at the Southside Water Reclamation Plant (SWRP). The SWRP has a nominal capacity of 76 mgd and uses anaerobic digestion to stabilize the sludge. Dewatering is performed using centrifuges. The existing SDR, does not provide reliable service, requires large amounts of annual maintenance, is at the end of its useful life, and needs to be replaced with a new, modern facility. The Engineer will conduct a preliminary design, prepare a Design Analysis Report (DAR), prepare a detailed design including construction bid documents, and provide engineering services during construction. Additional work may be authorized.
Estimated Design Cost:
Project No: 4781.60 $10,000,000 to $15,000,000 per year for three years
WUA Project Manager: Mike Wimberly, P.E., Senior Engineer
WUA Division: Water Resources, Engineering and Planning
The Chairman called the meeting to order at 9:00 A.M. to review responses to the Request for Proposals. He reminded the Committee members of the section of the Rules and Regulations regarding lobbying to ascertain if anyone had been lobbied to support submittals on this project. The Committee members did not make a motion.
The Chairman asked Mike Wimberly, Project Manager if they wished to provide any additional information pertinent to the project, he had no additional information to provide.
The Chairman asked each Committee member to comment on the proposals, but to withhold giving their scores for each proposal until all discussions have ended.
John Stomp mentioned that the differences in his scores reflected the project manager's and the project team's experience related to this type of work and the technical approach in terms of understanding the needs of the Water Authority for this particular project. Mike Wimberly and Dave Price agreed with Dave mentioning that he thought that four of the five proposals were quite good.
Each Committee member provided their scoring. The Committee was advised of the scores and of the ranking according to these scores.
The Chairman asked the Committee Members if anyone wished to conduct interviews. The Committee declined.
In accordance with the Rules and Regulations, the following firms are the Committee's recommendation to the Water Authority Board of Directors as ranked by the final scores.
1. Carollo Engineering
2. MWH
3. AECOM
4. Smith Engineering Co.
5. Molzen Corbin
There being no further business before the Committee, the Chairman adjourned the meeting at 9:18 A.M.

____________________________________
Tom Ortiz, SAC Administrator & Chairman
WUA Selection Advisory Committee
Composite Selection Advisory Committee Evaluation Form |
|
|
|
|
|
|
|
PROJECT # 4781.60 Southside Water Reclamation Plant Solids Dewatering Facility Replacement |
|
DATE: 8-3-12 |
|
|
|
|
|
|
|
Evaluator |
Maximum |
Firm Name |
Firm Name |
Firm Name |
Firm Name |
Firm Name |
|
Points |
AECOM |
Carollo Engineering |
Molzen Corbin |
MWH |
Smith Engineering |
|
|
|
|
|
|
|
BLAIR |
100 |
77 |
84 |
74 |
81 |
79 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
PRICE |
100 |
61 |
78 |
54 |
67 |
66 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
STOMP |
100 |
78 |
91 |
72 |
85 |
70 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MONTOYA |
100 |
59 |
56 |
44 |
63 |
57 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WIMBERLY |
100 |
88 |
93 |
78 |
85 |
86 |
|
|
|
|
|
|
|
Total Possible Points |
500 |
|
|
|
|
|
Total Points (Before Point Deductions) |
|
363 |
402 |
322 |
381 |
358 |
Minus High and Low Scores Total |
|
-147 |
-149 |
-122 |
-148 |
-143 |
Total Points (Minus High and Low Scores) |
|
216 |
253 |
200 |
233 |
215 |
Resident Business Preference |
|
15 |
|
15 |
|
6 |
Sub-Total (After Res Bus Pref Applied) |
|
231 |
253 |
215 |
233 |
221 |
Minus Point Deductions (If Applicable) |
|
|
|
|
|
|
Sub-Total (All Applicable Deductions Applied) |
|
231 |
253 |
215 |
233 |
221 |
Plus Tie Breaker Points (If Applicable) |
|
0 |
0 |
0 |
0 |
0 |
SAC TOTAL SCORES |
|
231 |
253 |
215 |
233 |
221 |
|
|
|
|
|
|
|
|
RANK |
3 |
1 |
5 |
2 |
4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
High |
88 |
93 |
78 |
85 |
86 |
|
Low |
59 |
56 |
44 |
63 |
57 |
|
|
|
|
|
|
|
|
Breakers1 |
0 |
0 |
0 |
0 |
0 |
|
Breakers2 |
0 |
0 |
0 |
0 |
0 |
|
Total Breakers |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|